About this service
Start with the decisions that shape the work
Project coordination starts with understanding what the building work needs to achieve. For an extension, that means looking beyond additional floor area to consider existing rooms, movement through the house and service requirements. A practical brief gives the design discussion a starting point and helps distinguish essential changes from optional features.
CG Joinery & Building (Aberfeldy) Ltd is a family-run business led by owner Callum Gilbert, who has 25 years of construction experience. Residential work draws on an in-house team and specialist subcontractors. Plumbing and electrical requirements are considered alongside the building work rather than left until the layout is fixed.
For projects in Aberfeldy and Perthshire, we can assist with plans and Scottish building warrant applications and have established architect contacts. A site visit and detailed no-obligation quotation help define the work. Agree the design responsibilities, submission arrangements and construction scope for your particular project rather than assuming every responsibility sits within one general description.
Who it’s for
- Homeowners planning an extension with several connected design and construction decisions.
- Owners with drawings who want to discuss buildability, access and the construction scope.
- Households needing to consider occupation alongside disruptive building work.
Why it matters
Resolve dependencies before they interrupt construction
A decision about one part of a build can affect several others. Coordinating the information, work sequence and specification helps keep those connections visible.
Design information that leaves important questions open
An opening into an existing wall needs appropriate structural design. Roof junctions, floor levels and insulation continuity also require attention. Identify the professional input needed rather than treating an assumption about the existing house as information ready for construction.
Specialist trades considered too late
Kitchen layouts, lighting and plumbing influence construction and first-fix work. Leaving these decisions until finishes are underway can prevent the next trade from completing its part. Consider service positions alongside the layout and agree information requirements for homeowner-supplied fittings.
A quotation without clear boundaries
Drainage changes, external surfaces, steps and reinstatement can be overlooked when attention centres on the new room. Identify what is included and excluded. Compare quotations against the same specification rather than assuming different prices describe the same work.
Common mistakes to avoid
- Treating planning permission and a Scottish building warrant as the same approval.
- Leaving unknown ground or drainage conditions out of the scope discussion.
- Changing the specification without considering work already in progress.
- Assuming the house can remain occupied without discussing affected facilities and access.
Our process
How we deliver
your project management project.
Establish the brief
Describe what is not working in the house and what the proposed space should accommodate. Share drawings if available. Consider the connection to existing rooms, essential changes and optional features so the discussion starts with how the house needs to function.
Review the site and uncertainties
Use the site visit to discuss access, visible construction, the proposed connection and affected outside space. Identify conditions that need further investigation. Record uncertainties through design requirements, inspection needs or clearly stated quotation assumptions rather than treating hidden conditions as known.
Clarify information and scope
Confirm the permissions and professional design inputs needed. We can assist with plans and Scottish building warrant applications, drawing on established architect contacts where appropriate. Review the construction, specification and exclusions in a detailed no-obligation quotation before agreeing the work.
Coordinate construction decisions
Groundworks, structure, weather protection and the connection into the house need a planned relationship. Specialist plumbing and electrical work must fit that sequence. Discuss temporary separation and occupation before disruptive stages, and agree changes before they affect work already underway.
Review and hand over
Review the agreed work, outstanding items and relevant care information. Confirm arrangements for required completion documentation. Builds have six-month and one-year defects liability periods on terms confirmed per project; understand the applicable scope and reporting route before closing out the work.
What you gain
The benefits of doing it properly.
A brief linked to everyday use
Connecting decisions to cooking, eating, storage and family routines helps keep the original purpose visible. Additional floor area alone does not necessarily solve the problem that prompted the work.
A more informative quotation
An agreed specification gives the quotation a clearer basis. Roof construction, glazing, finishes and external work can then be considered together when deciding where to prioritise expenditure.
Services considered with the layout
Heating, plumbing, lighting and sockets influence furniture positions and room use. Considering specialist trade requirements during planning gives them a place in the construction sequence.
Visible assumptions and exclusions
Identifying unverified conditions helps distinguish settled design information from matters still requiring investigation. Clear exclusions also make the intended end point of the building work easier to understand.
Realistic occupation discussions
Understanding affected rooms, service interruptions and access restrictions helps households consider remaining at home. Suitable arrangements depend on the work and how safely the site can be separated.
Care considered before completion
Access to gutters, drainage points and service components belongs in the design discussion. Relevant care information at handover helps distinguish ongoing maintenance from outstanding building work.
In detail
The practical details behind a coordinated project
Each house and plot brings different constraints. Access, existing construction, ground conditions and the proposed layout all influence the decisions needed before and during building work.
Approvals and professional responsibilities
Planning requirements and Scottish building warrant requirements are separate questions. Check the position for the proposal rather than assuming modest work needs no formal consideration. Site constraints and the status of the property may affect the advice required. Agree who is responsible for design information and submission arrangements.
Where engineering input is needed, construction should follow the agreed design. Structural support, foundations and the effect of openings on adjacent floors, walls and finishes need consideration. An assumption based on appearance is not a substitute for information affecting stability or weather resistance.
Access, groundworks and external reinstatement
Review the proposed footprint alongside drains, ground levels and access. Visible conditions can inform discussion, but hidden ground or drainage conditions may require investigation. Agree how unknown items will be handled commercially and practically instead of treating an unverified foundation assumption as settled.
Delivery and storage space influence how work can proceed, particularly beside an occupied house. Discuss routes to the working area and surfaces that may be disturbed. Include or exclude reinstatement, garden access and affected boundaries clearly within the scope.
Specifications, changes and finishing information
Finishing choices depend on the construction beneath them. Floor build-ups affect levels, kitchen arrangements affect services and lighting choices affect first-fix work. For homeowner-supplied fittings, agree the information and delivery responsibilities needed so missing specifications do not prevent another trade completing its work.
Glazing decisions should also consider heat loss, solar gain, ventilation, privacy and furniture positions. Review choices together rather than selecting from appearance alone. Where the specification changes, distinguish the revised requirements from the original quotation and agree changes before they alter work in progress.
Next step
Request a Quote for your building project
Call CG Joinery & Building (Aberfeldy) Ltd on 07584 048096, Monday to Saturday, 6am–8pm. Share your plans and priorities to discuss a site visit, the proposed scope and a detailed no-obligation quotation.
£2m public & employers’ liability · 6 & 12-month defects liability on builds · Mon–Sat 6am–8pm